Installation Precautions

Successful air cooler project are 70% quality-focused, and 30% installation-focused. Installation is crucial step and its quality impacts performance and lifespan of the unit. When installing an evaporative air cooler, pay attention to the following points:
01
Most importantly, ensure the personal safety of the installer during installation to prevent accidents. This is the most important discipline. Specific requirements are as follows:
02
During installation, strictly follow the design drawings which designed by professional engineer.
 
Qualified workers must be employed who are comfortable working at heights and physically fit. The elderly and infirm are not permitted to perform these tasks.
Safety belt and helmet must be worn when working at heights.
Protective and non-slip shoes must be worn when working at heights.
When welding, the site must be cleaned and a fire extinguisher must be provided. Cooling pad and casing are flammable and must be removed during welding.
Galvanized air ducts material can easily cut hands, so wear protective gloves when handling them.
When lifting cooler, the site must be cleaned and supervised.
Electrical wiring work must be performed by certified electricians. Unlicensed work is prohibited.
  • 1
    It is best to add a guardrail to the air cooler mounting frame. We recommend to install this type of guardrail. This is inexpensive, convenient for after-sales service, and ensures personal safety.
  • 2
    The air cooler mounting frame must be manufactured according to professional drawings. After installation, ensure sufficient distance on the wall surface for the wall side panels to enter and exit.
  • 3
    The air cooler mounting frame must be level; otherwise, it will affect the water distribution of the water distributor and cause leaks.
  • 4
    Use only standardized expansion screws to secure the air cooler mounting frame. During installation, the wall structure must be ensured adequate support during installation.
  • 1
    When installing the air cooler, choose a well-ventilated location to ensure optimal performance.
  • 2
    Use a standard power cord with Sufficient diameter to ensure electric safety.
  • 3
    Each unit must have one power switch, and ensure that the ground wire of each air cooler is connected to the power supply ground wire.
  • 4
    During installation, electrical parts must comply with electrical specifications.
  • 1
    Use standard water pipes; do not use inferior quality pipes.
  • 2
    Each air cooler must be equipped with a water inlet valve.
  • 3
    Each air cooler must be connected to drain pipe.
  • 4
    After installation, each air cooler must be inspected to ensure that it is qualified.
Fuzhou Green Mechanical and Electrical Technology Co., Ltd. had been established in January 2011. The founders Lin LiMing, Huang,JianQing and Peng ShunGang have engaged in evaporative air cooler since 2003.Among them the lead author Lin LiMing drawed up China Evaporative air cooler national standards. R&D experts Huang JianQing and Peng ShunGang have rich experience...

Quick Links

Product Category

Project

Copyright © 2025 Fuzhou Green Mechanical and Electrical Technology Co., Ltd. All Rights Reserved.  Sitemap | Privacy Policy  闽ICP备2025125566号-1